Dicor Rubber Roof Coating Drying Time
A full 30 days is needed before this lap sealant is fully cured.
Dicor rubber roof coating drying time. But because it takes so long to cure 80 it might be wise to let it dry for 48 hours before letting it get wet. Factor these things into your planning as well. So that would be the minimum time frame you would be looking at. Acrylic coating is an excellent protective barrier extending the life of your rubber roof membrane.
Dicor acrylic coating shall be applied in a minimum of 2 coats at a rate of 1 gallon per 125 sq. My roof has developed mold mildew. Dicor s lap sealant becomes waterproof in just 4 hours. It should be checked periodically.
8 x 30 roof takes 4 gallons. Cure time once applied roof coatings take 24 to 48 hours to fully cure and strengthen its bond with the roof. Actual gallons required will depend on the type of surface and texture method of application and weather conditions at the time of application. Ft per coat i e.
Actual gallons required will depend on the type of surface and texture method of application and weather conditions at the time of application. If the repair is applied properly the patch should last the duration of the membrane. Dicor has developed several prepackaged peel and stick repair kits that work well on tears. Saves over 25 in labour compared to similar systems.
8 x 30 roof takes 4 gallons. Refrain from doing anything else with the rv during this time and avoid rain and other hazards as best you can. Use with dicor rubber roof cleaner activator for proper adhesion.